0230

No Program

Lenze · EVF9300 Vector Drive

What does 0230 mean?

No PLC program has been loaded into the controller's memory. The controller is unable to execute any programmed logic or control functions without a loaded program.

Source: Lenze EVF9300 Vector Drive
Open Manual (Page 41)