PWR/2.5V Off (CIB_SR)
CIB_SR 2.5V Power Supply Not Present
Kuka · Sunrise Cabinet Med Controller
What does PWR/2.5V Off (CIB_SR) mean?
The PWR/2.5V Green LED for the CIB_SR module is OFF, indicating a lack of 2.5V supply voltage to the module. This absence of critical operating voltage prevents the CIB_SR module from functioning correctly and could result in the non-operation of interconnected I/O nodes.
Common Causes
- The 2.5V power supply to the CIB_SR module is not present.
- No 2.5V power detected on the CIB_SR board.
- The CIB_SR communication interface board is missing its 2.5V power input.
Repair Steps & Checklist
Click steps to track your progress.
- 1
Check fuse F17.3 on the CCU_SR for continuity and proper rating.
- 2
Verify the presence and correct seating of jumper plug X308.
- 3
Check fuse F308 on the CCU_SR for continuity and proper rating.
- 4
If an external supply is used via X308, check the external power supply to ensure it provides the rated voltage of 24 V.
Verified technical data. Last updated: March 2026
Related Faults
Source: Kuka Sunrise Cabinet Med Controller