8
DC under voltage
Danfoss · VLT AutomationDrive FC 301/302
What does 8 mean?
If the DC-link voltage drops below the undervoltage limit, the drive checks for a 24 V DC back-up supply. If no back-up is connected, the drive trips after a fixed time delay, which varies by unit size. This usually indicates an issue with the mains supply.
Additional Steps
Steps 1–2 are listed in Priority Fix.
- 3
Perform a soft-charge circuit test, if applicable, to ensure the DC bus pre-charge is functioning correctly.
Source: Danfoss VLT AutomationDrive FC 301/302
View Official PDF